Wall fixation

In the case of wall fixation, the mixer is mounted directly on the basin wall. Lay the connection cable against the basin wall and lead it upwards.

  1. Operating space/installation location is prepared for the installation. Defined clearances to fixtures and basin walls are kept in accordance with the consulting documents.
  2. Mixer is not connected to the mains.
  3. For installation at heights over 1 m, use scaffolding with a safety harness.
  1. Have 2 persons position the mixer against the basin wall and mark the fixation holes.
  2. Set the mixer down outside of the working area.
  3. Drill fixation holes and insert anchor bolts. NOTICE! Follow the manufacturer’s installation instructions!
  4. Once the anchor bolts have hardened in place, have 2 persons place the mixer on the anchor bolts and fix in place with fixation material.
  5. Fix the mixer firmly against the basin wall. NOTICE! Follow the manufacturer’s installation instructions!
  6. Lay the connection cable against the basin wall so that it is slightly taut. CAUTION! If the connection cable leads over the edge of the basin, beware of potential abrasion. Sharp edges may damage the connection cable. Bevel the basin edge if necessary!
  7. Apply corrosion protection (e.g. Sikaflex): Fill the slotted holes on the motor flange up to the washer.
  1. Mixer is installed. Make the electrical connection.
Wall fixation
Wall fixation